Abvy

Alcohol tracking on your Apple Watch

The phone stays in the pocket. The evening stays measured. September 2026.

Abvy's reading · September 2026
The best drink tracker is the one you actually use at drink four, not the one you reconstruct tomorrow. Abvy on the watch is two taps from the wrist - and it taps back when your own limit gets close.
Abvy's watch Now screen: RELAXED, ~0.39 ‰, sober around 2:51, tonight's curve with each drink marked
The Now screen - status, estimate, sober window, and the night as a curve

Log without breaking the conversation

The watch app puts your repeat-last drink and four favorites one tap away, with water and food as first-class buttons next to them. Every log confirms on the wrist with the updated sober estimate - and a 60-second undo, because wrong taps happen at a bar. Logged a beer an hour late? Turn the crown to backdate it, up to four hours in 15-minute steps.

The evening at a glance

The Now screen shows your current estimate in your local unit, the 5-level status from sober to drunk, the estimated sober window, and tonight's projection drawn as a curve. Spin the crown to scrub forward in time - "where will I be at midnight?" is a flick of the wrist, not a mental calculation. A second screen tracks the shape of the night: your estimated peak, when you'll start feeling the last drink, and when the next one fits your pace.

Haptics at the moments that matter

Set your own limit and the watch taps you quietly: when you're approaching it, when you cross it, when you're back under, when pacing opens for another drink, at your estimated peak, and at your estimated sober moment. Nobody at the table sees a thing.

On the watch face all night

One complication, four styles - a circular gauge against your limit, a corner readout, a rectangular card with a miniature curve, and an inline line. During a session it surfaces in the Smart Stack on its own and quietly steps back once you're sober, and it updates all night from a precomputed curve, so the face stays truthful without draining the battery. In privacy contexts the number redacts itself.

It needs a paired iPhone - the estimate is computed on the phone and the watch shows it. If your phone is out of reach, drinks you log on the watch queue locally and sync the moment the connection is back, so nothing gets lost mid-evening.

The watch app ships with Abvy - one subscription, every surface: iPhone, watch, widgets, Live Activity.

Download on the App Store Get it on Google Play

Abvy estimates - it never measures. It is not a breathalyzer and can't tell you whether you're under a legal limit or fit to drive.